Bridgestone Associates performed a comprehensive energy audit and benchmarking study of this 54 MGD wastewater treatment facility. The scope of services accomplished in a 12 week period included a complete analysis of all process equipment, systems and facilities for existing energy use and methods of operation, recommendations on changes in technology to lower energy costs, analysis of existing supply tariffs, analysis of medium term and long term energy supply options, analysis of existing on-site peak shaving generator operations, recommendations on real-time metering and monitoring, and recommendations on operational and behavioral changes to improve and lower energy use. The scope included the main wastewater treatment plant as well as pumping stations and the Authority’s office and administration buildings.